Surrey Satellite Technology
Location
Guildford
Size
30,000ft² (3 buildings)
Services
- Office Fitout
Project Details
Building one, SSTL & DMC:
- Merging DMC and SSTL over spill staff into new building.
- 120 new workstations, meeting rooms and kitchen and reception overhaul regarding design and furniture.
Building two, SSTL Headquarters:
- Required design consultancy services for new reception and café breakout space.
- Café furniture supplied as well as 400 workstations installed over 3 separate floors.
Building three, SSTL manufacturing centre:
- Design consultancy services for kitchen breakout area.
- Supply and installation of 100 workstations.
16+ year relationship
We are proud to say that SSTL have been one of our longstanding clients; our first design work for them was carried out in 2004. In 2019, Kinetic returned to do another overhaul of the café area in building two, turning it into a homely, breakout lounge “hub” and modern, stylish kitchen lunch area. Kinetic Workplace have a good working relationship with SSTL to this day.
“Vince and Kinetic Workplace have a 20 year long standing relationship with SSTL, and with several members of Facilities staff over this period. Kinetic have carried out design, fitout and furnishing work for us in 5 buildings over the years. The most recent projects include new furniture 2nd time around, and the redesign and fitout of our new HUB cafés in two buildings. The fact we are still using Kinetic after so many years is testament to the level of service Vince and his team provide and long may it continue, thanks Vince.”
Andrea Doe
- Facilities and Health & Safety Manager